USED LAUNDRY EQUIPMENT * Buy * Sell * Trade

SERVICES WE OFFER

 ChillersAndBoilers.com

Click on Link above to View Web Site. 

A Division of Stanco Industries, Inc.

 Buying & Selling Used Equipment, Since 1970

   

We want your used Power Plant equipment:

 Chillers * Condensers * Cooling Towers * Boilers

Electric Switch-Gear * Electric Motors

Stainless Steel Holding Tanks * Back-Up Generators

Transformers * Water Heaters

Waste Water Treatment * Turbines * Compressors

 Condensers * Commercial Laundry Machinery

                                                                                                            

We also Specialize in "Abandoned In Place" and "Hard To Remove" items.

 ChillersAndBoilers.com has performed Chiller/Boiler Removal for Major Universities, Medical Centers and many Fortune 500 Companies. Complete list of References, provided on request.

 Provide us with information on the item(s) you have, or will have available and we will reply with an offer within 24 hours. Please provide photos, if available.

Payment In Full, Prior To Removal; Cash, Bank Wire, Or Bank Check. 

 

Single items or Complete Facilities, NATIONWIDE.

We pay Top-Dollar, PLUS Disassemble, Load and Transport.

Plant Disassembly & Decommissionning.

 Email:  stancoind@aol.com

Removal

 

Located on 2nd floor, of a major university,this York 1100-ton absorber is scheduled for a "Controlled Demolition". Refrigerant removed, excess piping removed and capped.

 

 

 

 

From This 

 

 

 To This

 In just 4 days

 

 

 

 

 

 

  

 

    

 

Our Professional and Experienced workmen will remove shell and inner tubes, using cutting torches, with High Temperature Propane and Liquid Oxygen. 

Experienced with a "Safety First" mindset, this absorber will be completely disassembled. Salvagable parts and components are shipped to our warehouse, for resale. Remaining metal is recycled.

 

 

  Inside View

  Lower section ready for torching. 

 

 

 

 

 

 

 

 

  

Chain Hoist

 

Tubes and inner structure removed, our crew are ready for final demo phase. Entire structure will be torched into 4'X4' pieces, placed on skids and lowered to next level to be placed into recyle container.

 

 

 

 

 

    Loaded on Truck

 Loading salvaged rooftop. Due to inclement terrain, and using extreme caution,trucks had to be loaded in "Center Turn Lane" and scheduled to not interfere with Power Plant, or Medical Center daily operation.